STOCKSTHAT RIP Get the Wire

Filings · Filter

NI 43-101 Technical Report

Recent NI 43-101 Technical Report filings across the small-cap and venture space.

← All filings NI 43-101 Technical Report (3)
Company Filing Type Filed Summary Source
Torex Gold Resources Inc. NI 43-101 Technical Report Jul 7, 2026 Torex Gold Resources (TSX: TXG) filed the NI 43-101 Technical Report and Preliminary Economic Assessment for the Los Reyes gold-silver project in Sinaloa, Mexico on SEDAR+ on July 7, 2026 (effective date April 25, 2026), showing after-tax NPV of US$1.5 billion and IRR of 37%, with average annual production of 134 koz AuEq (93 koz Au + 2,992 koz Ag) over a 14.4-year mine life financed entirely from internal cash flow. The exceptional PEA economics at Los Reyes establish it as a major potential brownfield growth catalyst and possible standalone project or strategic M&A target within Mexico's gold-silver corridor. Filing ↗
Mako Mining Corp. NI 43-101 Technical Report Jul 7, 2026 Mako Mining (TSXV: MKO; Nasdaq: MAKO) announced NI 43-101 Proven and Probable Mineral Reserves of 597,744 oz Au and 6.30 Moz Ag (0.327 g/t Au, 3.45 g/t Ag in 56.8 M tonnes) at the Moss Mine in Arizona, with post-tax NPV5% of US$254 million and a 15-year mine life at US$3,500/oz Au and US$50/oz Ag; average annual production is 30,900 oz Au through 2039. The technical report will be filed on SEDAR+ within 45 days. This first formal reserve statement gives Moss Mine institutional-grade credibility as a long-life gold-silver asset with significant near-term production upside. Filing ↗
Silvercorp Metals Inc. NI 43-101 Technical Report Jun 24, 2026 Silvercorp Metals (TSX/NYSE: SVM) filed two updated NI 43-101 technical reports on June 24, 2026: the 'Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China for the Gaocheng Mine' (prepared by SRK Consulting China Ltd, effective December 31, 2025), confirming Measured & Indicated resources of 18.28 Mt at 65 g/t silver, 0.91% lead, and 2.24% zinc with Proven & Probable reserves of 6.19 Mt at 63 g/t Ag; and an amended technical report for the Tulkubash and Kyzyltash Chaarat gold projects in Kyrgyzstan, replacing an erroneous earlier version on SEDAR+. These filings establish refreshed resource baselines for key assets in Silvercorp's silver-lead-zinc portfolio and are material for investors modeling production continuity at Gaocheng, one of Asia's most prolific underground silver mines. Filing ↗